Main Facilities

  • About Us
  • Main Facilities
주요시설현황
Facilities Size Tasks
Olympic Memorial Citizens' Center
  • 2 floors below ground and 3 above ground
  • Site: 16,089 ㎡
  • Total floor area: 7,019 ㎡
  • Managing and operating the small theater
  • Managing and operating the gym
  • Running sports activity programs
Geumo Tennis Stadium
  • 1 floor below ground and 2 above ground
  • Site: 24,966 ㎡
  • Total floor area: 4,997.74 ㎡
  • 15 sections (indoor - 4, outdoor - 11)
  • Managing tennis stadiums
Gupo Lifetime Sports Park
  • Site: 28,052 ㎡
  • Total floor area: 224.36 ㎡
  • Soccer field (1), Futsal field (1), Tennis stadium (6)
  • Foot volleyball & volleyball court (1), basketball court (1)
  • Parking (135)
  • Managing the Gupo Lifetime Sports Park
Workers' Welfare Center
  • 2 floors below ground and 3 above ground
  • Site: 7,746 ㎡
  • Total floor area: 4,607 ㎡
  • Running sports activity programs
Public Parking Lot
  • Offroad: 3,110 slots in 3 places
  • Road: 508 slots in 7 places
  • Attached to buildings: 533 slots in 2 places
  • Managing and operating parking lots
Bonggok Library
  • 1 floor below ground and 3 above ground
  • Site: 11,837 ㎡
  • Floor space: 4,825 ㎡
  • Reading seats: 704 seats
  • Running the library
Seonsan Library
  • 1 floor below ground and 3 above ground
  • Floor space: 2,942 ㎡
  • Floor space: 2,942 ㎡
  • Reading seats: 406 seats
  • Running the library
Common Utility Tunnel
  • Length: 1530 m
  • Width: 4.5 m
  • Total floor area: 6,885 ㎡
  • Managing the common utility tunnel
Recreational Forest
  • Forest house (10)
  • Nature house (6)
  • Site: 152 ha
  • Operating lodging facilities
Gumi Equestrian Field
  • Site: 90,129 ㎡
  • Indoor racetrack (2,6075 m²), outdoor racetrack (15,544 m²), circular racetrack (1,963 m²)
  • Managing the horseback riding course and collecting fees
Gumi Memorial Park
  • 1 floor below ground and 3 above ground
  • Site: 137,821 ㎡
  • Total floor area: 7,397.13 ㎡
  • Crematorium with 5 cinerators (capacity: 8 units)
  • Running an eco-friendly cremation facility
First Buddhist Site in Silla Period
  • Site 36,919 ㎡
  • Total floor area 2,537.14 ㎡
  • Storytelling hall: 1
  • Exhibition hall: 1
  • Traditional house experience: 10 buildings
  • Buddhist culture experience: 3 buildings
  • Other (outdoor toilets): 1 building
  • Managing and operating the first Buddhist site in Silla Period
Gumi Campground
  • Total floor area: 71,300 ㎡
  • Caravan (for 6 people): 10 units
  • Auto campground: 80 sections
  • General campground: 80 sections
  • Flat bench: 26 units
  • Running campgrounds
Gumi Sewage Treatment Plant
  • Facility capacity: 330,000 ㎥/day
  • Fluidized bed incinerator: 80 ㎥/day × 2 units
  • Managing and operating sewage treatment facilities
Complex 4 Sewage Treatment Plant
  • Facility capacity: 50,000 ㎥/day
  • Managing and operating sewage treatment facilities
Wonpyeong Sewage Treatment Plant
  • Facility capacity: 60,000 ㎥/day
  • Managing and operating sewage treatment facilities
Zero-Carbon Education Center
  • 2nd floor: Operation office, Nature Conservation Movement Birthplace Memorial Hall, second exhibition hall
  • 1st floor: Permanent exhibition room, book cafe, special exhibition room, multi-purpose hall
  • B1: Permanent exhibition room, electrical room, machine room
  • Outdoor: Renewable Energy Experience Center
  • Managing and operating climate change-related experience spaces
Sandong Sewage Treatment Plant
  • Facility capacity: 8,000 ㎥/day
  • Managing and operating sewage treatment facilities
Dogae Treatment Pant and Village Sewerage System
  • Facility capacity: 75,000 ㎥/day
  • Village sewerage: 17 places including Songsam
  • Managing and operating the Dogae Treatment Plant
  • Managing and operating the village sewerage systems